LOW NOx BURNER CONVERSION
Pennsylvania Paper Mill
|
Locke Equipment provided all field construction services for Coen Co. for emission reduction on 3 boilers at a paper mill.
The boilers were all field-erected units. Two boilers are Tangentially Fired and one is Front Wall Fired.
|
Locke's scope included:
· Refractory Modifications
· Burner Installation
· Fuel Piping Installation
· Electrical Connection
· Wind Box Modifications
Charles Morton managed Locke's field crew with assistance by Dan Dill. The installation crew was assembled from local union craft personnel.
|
 |
For information about boiler emissions reduction contact Locke Equipment sales Co. Inc. at 913 782 8500.
|
 |